New Septic System Installation
New Septic System Installation in Spartanburg
A new septic system is a full onsite wastewater treatment build: the tank, the distribution box, and the drainfield, all sized from your bedroom count and your soil. Cleantechfinance designs and installs conventional gravity systems, along with aerobic and mound systems when the soil calls for them, for homes across Spartanburg and Spartanburg County. A three bedroom home in the 29302 area typically needs a 1,000 to 1,250 gallon tank feeding a drainfield sized to the perc rate.
Why Start With a Perc Test
The soil, not the tank, decides what your system looks like. A percolation test measures how fast water drains, and a soil profile check finds the seasonal high water table. Those two numbers set the drainfield size and tell us whether a gravity field will pass or whether you need an aerobic treatment unit. Skipping this step is how systems end up undersized and surfacing effluent a few winters later.
Our Process
We run the perc test and site evaluation, pull the Spartanburg County health department permit, then set the tank in concrete, polyethylene, or fiberglass to match your lot. We install the distribution box, lay the drainfield trenches or chambers, backfill, and file the as built record. Well setbacks of 50 feet to the tank and 100 feet to the drainfield are held throughout.
Call (864) 882-8328 for a site visit and a written quote on a new septic system in Spartanburg.
Need help in Spartanburg?
Call (864) 882-8328